Hi
I bought a 1+ ac. lot near Homer AK. and it has covenants and restrictions... I am not looking for legal advice, but just your thoughts about if I should attend the class with the intention of building.
The C&R include a 900 sf minimum, with no reflective siding or roofs. My real concern is about "All residential structures must meet all applicable codes specificaions and be completed within 18 months from the date construction is started, no unattached structure, including garage, carport or storage building may be constructed before the construction of the main residence."
The LHBA "Keep Out" signs send a strong message, and I wonder if the "all applicable codes" trumps my sign.
Anyway, I am a 62 y/o mainframe computer dinosaur, liberal, very attached to GSD.s. without legal interest - other than survival.
Thanks.
Help
Just Ed
mr. ed was a horse of course..



Joined: 2008-10-06